I have heard Elliott is really wrapping up pretty soon. I went up there during winter break and everything looked amazing, with just a few things (oh, just an electrically-actuated moving dining/coffee table) to be buttoned-up. Congratulations to everyone that worked on the project, to Merlin for staying sane(ish), to Wendell and Tommy for the vision, and to the Leavitt Weaver crew as well. And thank you to CZ and the Elliott's for letting me be a part of it.